Piping systems and pressure parts of boilers
References
Year | Project | Desciption | Place |
---|---|---|---|
2020 | Braunschweig | Boiler piping and steel structure, Rohr2, PDMS model, SCIA calculation, TEKLA model | ![]() |
2019 | Jaquatirica | Boiler piping and steel structure, Rohr2, PDMS model, SCIA calculation, TEKLA model | ![]() |
2019 | Santiago de Compostela | Detail engineering of biomass boiler piping system, Inventor, Rohr2 analysis | ![]() |
2018 | Vulindlela | Engineering of piping system - Sulfite Recovery Boiler and Secondary Recovery Plant, PDMS | ![]() |
2018 | USS Košice | Basic engineering of piping system - ignition hoods replacement | ![]() |
2018 | Apan | Engineering of steam boilers site installation. E3D model, TEKLA model, Rohr2 | ![]() |
2018 | Luján de Cuyo | Boiler piping and steel structure / cassette system. Rohr2, PDMS model, SCIA calculation, TEKLA model | ![]() |
2017 | Smits | Detail engineering of piping system, PDMS | ![]() |
2017 | Luso Finsa | Detail engineering of biomass boiler piping systems, Inventor, Rohr2 analysis. | ![]() |
2017 | Veliko Tarnovo | Detail engineering of thermal oil economiser, Rohr2 analysis | ![]() |
2016 | Ibrahim Fibres Limited | Detail engineering of steam/water piping systems, Rohr2, PDMS model | ![]() |
2016 | Unipetrol | Detail engineering of boiler RRmix system installation | ![]() |
2015 | Värtaverket | Detail engineering of piping systems, supports, PDMS model | ![]() |
2015 | Janikowo | Detail engineering of economisers, boiler retrofit | ![]() |
2015 | Plock | Detail engineering of the horizontal HRSG boiler, pressure parts | ![]() |
2014 | Rybnik | Detail engineering of feed-water piping system, ECO retrofit, PDMS model | ![]() |
2014 | Pengerang | Detail engineering of the horizontal HRSG boiler, pressure parts | ![]() |
2013 | Blackburn Meadows | District heating piping - detail engineering | ![]() |
2013 | TATA STEEL | Detail engineering of piping system for tertiary metallurgy, PDMS model | ![]() |
2012 | Lausward | Detail engineering of the horizontal HRSG boiler, pressure parts | ![]() |
2012 | Mellach | Detail engineering of piping supports for BOP system (PDMS) | ![]() |
2011 | STF Hong Kong | Basic and detail engineering of steam and water piping system. | ![]() |
2011 | MPZ1 Moscow | Basic and detail engineering of piping, PDMS model | ![]() |
2011 | STD8000H (STD) | Detail engineering of the horizontal HRSG boiler, pressure parts | |
2011 | STD8000H-SCR (STD) | Detail engineering of the variant horizontal HRSG boiler with SCR, pressure parts | |
2011 | Knapsack | Detail engineering of the horizontal HRSG boiler, pressure parts | ![]() |
2010 | STD4000F (STD) | Detail engineering of the horizontal HRSG boiler, pressure parts | |
2009 | RDK8 Rheinhafen, Karlsruhe | Detail engineering of piping supports (PDMS) | ![]() |
2009 | IRSCHING 4 | Detail engineering of HRSG boiler pressure parts | ![]() |
2008 | Dürnrohr - Linie 3 | Extension of thermal incineration plant, PDMS model, basic and detail engineering of piping | ![]() |
2008 | Forsmark 2 | Basic and detail engineering of nuclear power station piping system, PDMS model | ![]() |
2008 | Höchst EBS-Verbrennungsanlage | Detail engineering of piping and pipe supports | ![]() |
2008 | GuD Kraftwerk Timelkam | Detail engineering of boiler pressure part | ![]() |
2007 | Tallawara | Detail engineering primary and secondary pipe suppors | ![]() |
2007 | Repowering SIMMERING BKW 1 /2 | Detail engineering of boiler pressure part, piping system | ![]() |
2007 | Forsmark 1 | Basic and detail engineering of nuclear power station piping systém, PDMS model | ![]() |
2006 | Ineos Phenol A6+ | Basic and detail engineering of chemical industry piping, PDMS model | ![]() |
2006 | MSZ3 Moscow | Basic and detail engineering of waste incinerator piping systém, PDMS model | ![]() |
2006 | Söderhamn | Detail engineering of piping, pipe supports and ducts | ![]() |
2006 | HRSG Karstoe SAG | Detail engineering pressure parts of horizontal boiler, piping, vessel, chimmey, casing | ![]() |
2005 | Hallein | Detail engineering of biomass boiler piping system | ![]() |
2005 | HKW Nordweststadt | Detail engineering of steam/water piping system | ![]() |
2005 | Pavlodar | Detail engineering of piping, PDMS model of piping system hydrogen unit | ![]() |
2005 | Timelkam | Detail engineering of biomass boiler piping system | ![]() |
2005 | DCN Blast Furnace | Basic and detail engineering of blast furnance piping system, PDMS model | ![]() |
2004 | Linz, Alba, Kaeng Khoi 2, GK Mannheim | Detail engineering primary and secondary pipe supports for various projected | ![]() |
2004 | Bischoferode | Basic engineering (3D model) of incineration plant - boiler, piping systems | ![]() |
2004 | BASF Ludwigshafen | Detail engineering of boiler stack, pressure vessels | ![]() |
2003 | Stendal | Detail engineering of biomass boiler piping system | ![]() |
2003 | Olefins II Revamp | PDMS model of petrochemical production piping system | ![]() |
2003 | HKW München Süd GuD2 | Detail engineering of the horizontal HRSG boiler, pressure parts | ![]() |
2002 | Langerbrugge | Basic engineering of biomass boiler house - steam and water piping systems | ![]() |
2002 | Niklasdorf | Detail engineering of biomass boiler piping system | ![]() |
2002 | Al Hidd | Detail engineering primary and secondary pipe supports | ![]() |
2001 | C4 Olefins Complex | PDMS model of petrochemical production piping system | ![]() |
2001 | Dow Chemical | Horizontal HRSG boiler (ASME) - detail engineering pressure parts | ![]() |
2001 | Wesseling, Castejon, Elbistan, Dezhou, Valle de Mexico | Detail engineering primary and secondary pipe supports for various projected | ![]() |
2001 | Brighton Beach | Steam and water pipelines of power station, PDMS model boiler house, heating surfaces and headers of boiler, casing, detail engineering steel costruction | ![]() |
2001 | STD | Basic engineering of biomass boiler house - steam and water piping systems | |
2001 | East River - New York | Horizontal HRSG boiler (ASME) - detail engineering of piping systems | ![]() |
2000 | Taweelah | Horizontal HRSG boiler (ASME) - detail engineering of piping systems | ![]() |
2000 | Salzburg | Detail engineering of heavy oil boiler piping | ![]() |
2000 | San Roque, Meliti Achlada, Kardia, Shoaiba, Senoko | Detail engineering primary and secondary pipe supports for various projected | ![]() |
2000 | Donaustadt | Vertical HRSG system - steam and water pipelines of power station, PDMS model piping system in boiler house, heating surfaces, boiler chambers and casting. Detail engineering | ![]() |
1999 | Bergen | Refuse incinerating plant - detail engineering of piping system | ![]() |
1999 | T.A. Lauta | Refuse incinerating plant - PDMS models of flue gas cleaning and turbine house | ![]() |
1999 | ÖMV Schwechat | Reconstruction of boiler K7 - steam and water pipelines | ![]() |
1999 | Plomin II | Pilot project of piping systems for connection with Plomin I | ![]() |
1999 | MCHZ Ostrava | Refuse incinerating plant - piping of wet flue gas cleaning | ![]() |